This week we worked extensively on completing Miller Road's drawings. 1:10 detail drawings of the sections were required to correctly show the correct desired construction methods and technology/materials to be used. The roof detail also required ammendments as the specification of the roof had changed from tiles to sheeting and a specification had to be added to the legend to clarify the drawings.
No comments:
Post a Comment