This week I continued working on the Kenridge project. The proposed new carport was to be drawn up on the existing layout. The existing plans were not accurate to what was actually present on site, so I had to draw up sections of the existing house to get proper measurements and hence all of my previous drawings needed to be adjusted. After fixing all of the drawings, I produced a street view and arranged a good layout, displaying step by step what was to be done on site. After this I produced several legends, giving proper procedures which had to be carried out on site in specific order for the job to be completed correctly, safely and efficiently. The final step will be to see the client and ensure that they are happy with the design and then submit to council, after which 1:50 and detail drawings will be drawn up for the client.